In a PSD (random vibration) analysis, must the database be saved before using the time history post-processor (/POST26)?
In ANSYS Release 11.0, you must save all information after a PSD analysis before exiting ANSYS. All PSD information must be saved or it will not be possible to completely post-process all results. |
||
|