Why does RPSD abort in ANSYS 9.0 when I leave ANSYS after solution and
the reenter to do the postprocessing?
This is an error, Defect 29585. It is fixed in ANSYS 10.0. It occurs whenever the user leaves ANSYS after the PSD solution and then reenters to do the RPSD in POST26. It doesn't matter if the database that is resumed is from after the solution it still occurs. |
||
|